Operations

Al Wash-hi Majaza Copper Mine and Concentrator

Al Hadeetha Resources LLC (AHRL) is a joint venture between Alara Oman Operations Pty Ltd (a wholly owned subsidiary of Alara Resources Ltd), Al Hadeetha Investments LLC, and Al Tasnim Infrastructure LLC. The partnership was originally established in 2011 between Alara Oman Operations Pty Ltd and Al Hadeetha Investments LLC to explore and develop the mineral-rich license areas of Al Wash-hi Majaza, Al Ajal, and Mullaq. In 2019, Al Tasnim Infrastructure LLC joined the venture, bringing strong local expertise and execution capabilities to advance the project.

Located about 160 km southwest of Muscat in the Sultanate of Oman, the Al Wash-hi Majaza Copper-Gold Project is AHRL’s flagship operation. The development centres on a single open-pit mine supported by a 1 million tonnes per annum (MTPA) processing plant, engineered to produce high-quality copper concentrate for the export market.

AHRL has secured a long-term offtake agreement with global commodities trader Trafigura, under which most of the copper concentrate and associated gold production will be sold over the life of the mine. Pricing is tied to prevailing London Metal Exchange (LME) rates at the time of delivery, ensuring transparency and alignment with global market benchmarks.

Project Detail Information
Commenced
2024
JV Company
Al Hadeetha Resources LLC (AHRL)
Commodities
Copper, Gold
Mining License
Valid; 3 km²
Project Stage
Copper and Gold Concentrate Production
Total Capex
US$120 million (includes EPC, Project Management, STP & Pipeline, Power, Road, and Contingency) through to June 2025
Mining Method
Open-pit; 10.3 years
Infrastructure and Facilities
1 MTPA copper concentrator, 15000 cum water storage, dry tailing storage, 33 KV Sub stations, accommodation village, stores and offices
Final Production
2034
Shareholders in AHRL
Alara Oman Operations Pty Ltd (51%), Al Hadeetha Investments Services LLC (30%), Al Tasnim Infrastructure LLC (19%)

Copper Processing Plant

Our state-of-the-art 1 million tonnes per annum (MTPA) copper processing plant began operations in early 2024, with first salable production achieved in April 2025. Purpose-built for efficiency and reliability, the facility is designed to produce ~35,000 wet metric tonnes (WMT) of copper concentrate annually, averaging a copper grade of 20–22%.

Advanced Processing Technology
The plant integrates a robust flowsheet combining:

  • Primary Crushing – Jaw Crusher
  • Grinding – Semi-Autogenous Grinding (SAG) and Ball Mills
  • Classification – Hydro-cyclones
  • Concentration – Flotation Circuits
  • Product Recovery – Thickening and Pressure Filtration
  • Water Management – Concentrate and Tailing Dewatering Facilities

Each stage is optimized for high metal recovery, energy efficiency, and consistent output.

Sustainability in Action
AHRL has incorporated a Dry Tailings Storage Facility (DTSF) — one of the most advanced tailings management systems globally. This significantly reduces water consumption, minimizes environmental footprint, and enhances the long-term safety of operations.

Benchmark for the Region
By combining cutting-edge technology, rigorous safety protocols, and sustainable practices, the plant sets a new benchmark for copper processing in Oman and the wider region, reinforcing AHRL’s commitment to responsible resource development.